- New
1. Uncover the brass screw mounts for both the ceiling and floor fittings by removing the chrome caps.
2. Install the first brass mount onto the ceiling by screwing it in, and then reattach the ceiling-fitting cap along with the cable.
3. Once the cable is suspended, carefully position the floor fitting and screw in the floor mount.
4. Proceed by threading the cable through the floor-fitting cap and tension spring in the specified order.
5. Ensure the cable is secure by attaching the cable stopper and trimming any excess cable.
6. Attach the floor cap back onto the floor mount, making sure that the spring inside maintains cable tension.
7. Repeat the aforementioned steps for the second ceiling-to-floor cable, while considering the width of your steel plate art.
Complete Kit includes:
Hang 1 Metal/Poster: (2 x ceiling to floor fitting + 2 Supports)
Hang 2 Metal/Poster: (2 x ceiling to floor fitting + 4 Supports)
Hang 3 Metal/Poster: (2 x ceiling to floor fitting + 6 Supports)
Hang 4 Metal/Poster: (2 x ceiling to floor fitting + 8 Supports)
The 4-meter, 1.5-mm-thick cable that comes with the suspended false ceiling to floor weight...